Welcome to Tianjin King Auto-control Equipment Co.,Ltd
Governor
Oil Pressure Equipment
Automation Components
 
News  
 
Installation process of small governor transformation (built-in)
1. Remove the original governor. Installation process of small governor transformation (built-in) 2. Digging a foundation pit Installation process of small governor transformation (built-in) 3. Pre-embedded foundation steel structure and threading pipe. Installation process of small governor transformation (built-in) 4. Install the governor and adjust the connection with the turbine. Installation process of small governor transformation (built-in) 5. Pouring cement Installation process of small governor transformation (built-in) 6. After the cement is dry, it can be debugged. Installation process of small governor transformation (built-in) Installation process of small governor transformation (built-in)
 
 
 
Copyright.(C) 2020 Tianjin King Auto-control Equipment Co.,Ltd. All Right Reserved.
Landline: 022-26990200 26990202 Sales Hotline: 1360208688413612141426Technical support: 1375257935313602086884  Address: Beichen Technology Park, Tianjin