Installation process of small governor transformation (built-in) |
1. Remove the original governor.
Installation process of small governor transformation (built-in)
2. Digging a foundation pit
Installation process of small governor transformation (built-in)
3. Pre-embedded foundation steel structure and threading pipe. Installation process of small governor transformation (built-in)
4. Install the governor and adjust the connection with the turbine.
Installation process of small governor transformation (built-in)
5. Pouring cement
Installation process of small governor transformation (built-in)
6. After the cement is dry, it can be debugged.
Installation process of small governor transformation (built-in)
Installation process of small governor transformation (built-in) |
|
|
|
|
|
|
|
|
|
Copyright.(C) 2020 Tianjin King Auto-control Equipment Co.,Ltd. All Right Reserved. |
Landline: 022-26990200 26990202 Sales Hotline: 13602086884£¬13612141426£¬Technical support: 13752579353£¬13602086884 Address: Beichen Technology Park, Tianjin
|
|
|
|